Philippines · PHDVO
Davao / Sasa port intelligence & dry-bulk voyage planning
Current planning answer: do not treat “Davao” as a single berth specification. A voyage should resolve whether the requirement means Sasa or another facility in the broader Davao port system, then confirm the operator, berth, draft, cargo handling and applicable tariff. PPA-wide service rules can be relevant, but they do not replace that terminal-level confirmation.
Davao intelligence timeline
Current authority changes
PMO-Davao / Sasa developments are separated from PPA-wide rules and regional contingency information.
Checked 22 Sep 202612 Aug 2026
PPA-wide policyHigh impactPort cost
PPA issued supplemental fuel-adjustment guidance affecting regulated cargo-handling, terminal and pilotage services
The latest 2026 PPA issuance set includes fuel-adjustment mechanisms that can affect regulated service components at PPA ports.
Voyage implication: confirm the current implementation for the actual Davao/Sasa facility and operator rather than embedding one permanent surcharge assumption.
Philippine Ports Authority · 2026 issuances
11 Jun 2026
Regional operationsContingency
PMO Davao coordinated use of Malalag as a temporary alternative port after the General Santos earthquake
PPA directed coordination between PMO Socsargen and PMO Davao for temporary use of Malalag while General Santos underwent structural assessment.
Voyage implication: this is evidence that alternative-port planning can matter during regional disruption; it is not a statement that Sasa itself was closed or that Malalag is automatically suitable for a particular dry-bulk stem.
PPA · 11 Jun 2026
Official PMO Davao / PPA sourcesUse current PPA notices and the nominated terminal/operator for commercial confirmation.
Open PPACharterPulse will not infer one Davao-wide tariff, draft or discharge rate. Those are facility-specific confirmation items.
Why exact facility selection matters
Davao cargo requirements can reference Sasa, nearby private facilities or another point in the region. Resolve the exact terminal before comparing vessel fit, port time or discharge economics. A city-level PHDVO identity is useful for initial routing but not sufficient for a fixture.
Pre-fixture inputs
Confirm terminal/operator, maximum draft and dimensions, berth window, gear/grabs, cargo acceptance, discharge productivity, working hours, pilot/tug requirements, storage/free time and the tariff/pro forma applicable to the actual call.
Research checked 22 September 2026. Dynamic PPA/PMO-Davao notices extend this page while preserving facility-level caveats.