Indonesia · IDBPN
Balikpapan bulk & coal voyage intelligence
Current planning answer: use IDBPN to keep the route identity reproducible, then replace “Balikpapan” with the actual terminal, TUKS, anchorage or loading arrangement before a commercial circulation. Official KSOP records show bulk-carrier movements within the Balikpapan port area, but one movement approval does not establish coal suitability, a universal draft or guaranteed berth access.
Voyage implication:
Balikpapan-area bulk activity can involve anchorage-to-terminal movements and facility-specific requirements. The exact load point, cargo handling, draft, port time and local movement plan should therefore be confirmed before treating the estimator’s generic assumptions as shipment-ready.
Balikpapan evidence timeline
Official operating and safety context
Each event keeps its original scope so a specific movement is not turned into a broad port-wide claim.
Updated 22 Sep 2026
16 Sep 2026
High impactSafety policy
Harbour masters instructed to prioritise vessel, cargo, crew and weather safety before sailing clearance
Indonesia’s Ministry of Transportation reinforced the authority of KSOP offices to delay or withhold sailing clearance where safety requirements are not met.
Voyage implication: use this as national operating context for Balikpapan calls, not as evidence of a Balikpapan-specific closure or restriction.
Indonesia Ministry of Transportation · 16 Sep 2026
04 Jul 2025
Specific movementBulk carrier
KSOP Balikpapan approved a bulk-carrier movement from anchorage Zone 3 to a private terminal
The official movement approval names bulk carrier MEDELIN FIRST moving from Labuh Rede Zona 3 to TUKS PT Semen Indonesia for berthing, with local VHF, traffic, crewing and port-area conditions.
Voyage implication: this is evidence of bulk-carrier operations and facility-specific movement control in Balikpapan; it does not establish coal loading capability, a universal draft or berth availability for another stem.
KSOP Kelas I Balikpapan / Inaportnet · 04 Jul 2025
CharterPulse uses specific movement approvals as operational evidence only. Terminal capability, cargo acceptance, draft, productivity and availability must be confirmed for the nominated facility and vessel.
What to confirm for a real dry-bulk stem
Exact facilityTerminal, TUKS, anchorage or transshipment location—not only the broad Balikpapan port identity.
Port movement planAnchorage, pilot/tug needs, VHF/traffic requirements and any facility-specific movement approvals.
Cargo capabilityConfirm that the nominated facility accepts the cargo and the intended vessel/loading method.
Draft & dimensionsUse current facility and channel limits for the actual vessel rather than inferring them from another ship’s approval.
Productivity & waitingReplace the generic port-time input with the actual expected loading rate, waiting and service sequence.
Safety / SPBRecheck current weather, vessel readiness and harbour-master clearance requirements close to sailing.
Routes from Balikpapan
Research updated 22 September 2026. Exact terminal, cargo, draft, berth, movement and productivity conditions must be confirmed for the actual shipment.